When Is a House Actually Finished? Pre-Handover Checklist

Image
A building can look finished in photographs while still containing dozens of small incomplete items. That is why the period before handover deserves its own process. Look Beyond Appearance Fresh paint and cleaned floors create a powerful impression. But handover review should also consider functional items. Doors and Windows Check operation, alignment, hardware and visible finishing. Plumbing Fixtures and accessible plumbing points should be checked for proper operation and visible issues. Electrical Switches, outlets, fixtures and agreed systems should undergo appropriate testing. Finishes Review tiles, stone, paint, joinery and other visible finishes against the agreed scope. Waterproofing-Related Areas Wet areas and exposed areas require attention according to the project’s testing and quality procedures. Snag List Record incomplete or defective items systematically rather than relying on memory. Documentation The parties should complete whatever drawings, warranties, manuals, recei...